WHITECASTLE Day by Day Page 3
The front of the house begins to appear, with the framework over the front door, and a lot more interior walls have been completed.
The second floor is begun, and the first lines of the roof are established over the living room and kitchen side.
The highest peak of the roof climbs into a saphire sky.
Now the whole roofline has been drawn. See the glass blocks beside the front door?
On to the NEXT PAGE!